failed Pipeline #15423 triggered by
Adam Blank
@blank

Update plot-iter.gp

4 jobs for master in 0 seconds (queued for 64 minutes and 34 seconds)
latest
Status Name Job ID Coverage
  Test
failed arraylist #70677

failed combined #70679

failed files #70680

failed linkedlist #70678

 
Name Stage Failure
failed
files Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log
failed
combined Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log
failed
linkedlist Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log
failed
arraylist Test There has been a timeout failure or the job got stuck. Check your timeout limits or try again
No job log

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).

There are no test reports for this pipeline

You can configure your job to use unit test reports, and GitLab displays a report here and in the related merge request.